Construction camp for Toba Inlet run-of-river power project on B.C. coast east of Campbell River, 2009. (Tom Fletcher/Black Press)

B.C.’s private power vision shows up as big charge to hydro bills

NDP tracks B.C. Liberal donations while long-term contracts signed

Former B.C. premier Gordon Campbell’s rush into private electricity projects has turned into a high-voltage political battle over their long-term impact on B.C. Hydro rates.

As the NDP government gets ready to announce electricity rate increases to cover the $10 billion Site C dam and $5.5 billion in deferred debt from utility operations that kept rates artificially low during the B.C. Liberal years, it has issued a new report on the impact of run-of-river and other private power deals that Campbell’s government launched in 2002.

Those contracts with mainly run-of-river hydro, wind and biomass power producers, are expected to cost the utility $16 billion over the next 20 years, according to a new report commissioned by the government from former B.C. Treasury Board director Ken Davidson. Entitled “Zapped,” the report calculates the extent of what the opposition NDP said at the time, that B.C. Hydro was paying over market price for intermittent power that is generated mostly in spring when B.C.’s large dams are at full capacity.

RELATED: NDP’s Horgan reluctantly proceeds with Site C dam completion

RELATED: In 2011, Andrew Weaver was pushing for run-of-river power

Campbell’s 2002 B.C. Energy Plan set the direction, ordering B.C. Hydro to expand its electricity supply through long-term purchase contracts with private suppliers. The plan also required the utility to become self-sufficient in energy, rather than buying surplus power on the North American grid that may be from fossil fuel sources.

As Energy Minister Michelle Mungall prepared to release results of the NDP government’s review of B.C. Hydro performance Thursday, the political battle began with the NDP adding up $3 million in campaign donations collected by the B.C. Liberals from private power producers as their business boomed in B.C.

Campbell’s vision of B.C. as a climate change leader and clean energy exporter to California to replace fossil fuel sources was soon undone by technology and global events.

“Market prices for natural gas, and hence for electricity, remained strong until 2008,” Davidson’s report says. “The financial crash of 2008 reduced demand and prices. Unfortunately, this crash was timed with a major development in the oil and gas industry, which wasn’t fully appreciated until large amounts of new gas appeared in the market: shale gas and oil and hydraulic fracturing.”

B.C.’s private power contracts included biofuel cogeneration at sawmills and pulp mills, wind energy in the Peace region and the biggest player, run-of-river hydro. One of the largest-scale projects was by Plutonic Power on the Homathco River at Toba Inlet on the B.C. coast.

A second, larger phase with multiple river sites at Bute Inlet was cancelled as California and other major energy markets embraced gas-fired power.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

ChargerQuest expands its EV charging network into Kelowna

The new stations can be found at Manteo Beach Resort and the Eldorado Hotel

Kelowna resident warns North Glenmore community of active thieves in the area

Two thieves stole a pontoon boat from a residence on May 23

A second wave of COVID-19 is probable, if history tells us anything

B.C.’s top doctor says that what health officials have learned this round will guide response in future

Penticton Search and Rescue airlifts injured mountain biker near Naramata

The Penticton Fire Department initially took the call and attended to the injured biker.

LIVE: Procession to honour Snowbirds Capt. Jennifer Casey comes to Halifax

Snowbirds service member died in a crash in Kamloops one week ago

RCMP facing ‘systemic sustainability challenges’ due to provincial policing role

Provinces, territories and municipalities pay anywhere from 70 to 90 per cent of the cost of the RCMP’s services

One man dead after standoff with Chilliwack RCMP

The Independent Investigations Office of B.C. is investigating the RCMP’s role in the death

B.C. employers worry about safety, cash flow, second wave in COVID-19 restart

A survey found 75 per cent of businesses worry about attracting customers

Vancouver Foundation grants benefit Okanagan-Shuswap residents

Grants of up to $500 available for ideas that connect people socially or involve sharing skills

Ex-BC Greens leader Andrew Weaver says province came close to early election

Disagreement centred on the LNG Canada project in northern B.C.

Water quality advisory rescinded for Central Okanagan system

Turbidity levels improve enough to rescind advisory issued for Killiney Beach system May 11

Canada’s NHL teams offer options to season-ticket holders

Canadian teams are offering refunds, but also are pushing a number of incentives to let them keep the money

UPDATE: Two sent to hospital following Okanagan highway accident

Drivers in head-on collision air-lifted to hospital with serious but non-life-threatening injuries

Most Read