The proposal goes to Kelowna city council on Monday, Nov. 4. (File)

Kelowna International Airport wants to increase its fees for infrastructure projects

The $5 hike would help it complete $220 million worth of projects by the end of 2029

You could soon be paying additional fees on flights out of Kelowna International Airport.

A report headed to Kelowna city council on Monday includes a proposal to increase the Airport Improvement Fee (AIF) from $20 per departing passenger to $25 per departing passenger, effective March 1, 2020.

The hiked fee would help the city tackle future infrastructure projects to help the airport’s continual growth.

READ MORE: Kelowna mayor proud of his first year in office after re-election despite community pushback

READ MORE: ‘Bridge to nowhere’: Kelowna council dismisses second bridge over Okanagan Lake for incremental approach

“Kelowna International Airport’s passenger numbers increased 38 per cent between the year ended December 31, 2013 and the same period in 2018. This increase in passenger numbers has resulted in operational capacity constraints throughout the airport’s infrastructure,” states the report put together by airport management.

“In addition, some of the Airport’s existing infrastructure is reaching the end of its lifecycle and requires rehabilitation or replacement.”

According to the report, the increase would align YLW with the median costs per passenger for airports of similar size.

The airport improvement fee is expected to help for $191 million ($220 million with inflation) worth of projects by the end of 2020.

Those projects include:

  • Terminal expansion ($109 million, with inflation)
  • Apron expansion ($20 million, with inflation)
  • Self-serve baggage drop ($2 million, with inflation)
  • Airside lighting and supporting infrastructure design ($200K, with inflation)
  • Runway end safety area ($9 million, with inflation)
  • Combined operations building ($12 million, with inflation)
  • Common use terminal equipment ($3 million, with inflation)
  • Loading bridges ($2 million, with inflation)
  • Airside pavement rehabilitation ($51 million, with inflation)
  • Airside equipment ($13 million, with inflation)

The largest project included in the list is the terminal expansion, which would consist of an expansion of the departures lounge, the addition of a bridge on Gate 2 and the relocation of domestic arrivals to the south end of the terminal. The terminal expansion is estimated to be completed by 2023.

Also proposed by the airport is a two per cent increase to its landing and terminal fees, which would still be one of the lowest rates among similarly sized airports, according to the report. A fee of $1.50 per hour would also to be implemented for the use of the electric vehicle charging stations.


@michaelrdrguez
michael.rodriguez@kelownacapnews.com

Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Comments are closed

Just Posted

West Kelowna RCMP searching for suspects after stolen vehicle dumped

Police found the stolen pickup truck in the backcountry

Former Kelowna football player drowns in Fraser River

Kory Nagata went missing in the middle arm of the river

Kelowna’s Friends of Dorothy to host LGBT2Q+ live music acts

Matthew Presidente and Pedwell are on the bill for July 7 and 8

Security camera captures woman stealing package from Westbank doorstep

Sharon Utton posted a video of the incident to Facebook shortly after it happened on Saturday, July 4

Hidden cameras in Okanagan forests catch illegal dumpers, lead to fines

The Okanagan Forest Task Force’s have led to 13 or 14 tickets for illegal dumpers

84-year-old Okanagan resident finishes 12,000-piece puzzle

Willie Tribiger started the puzzle in 2013, completing it in six and a half years

Aces aplenty at Okanagan golf course

Vernon Golf and Country Club has 14 recorded holes-in-one since April 30

Fraser Valley woman complains of violent RCMP takedown during wellness check

Mounties respond that she was not co-operating during Mental Health Act apprehension

B.C. sees 12 new COVID-19 cases, no new deaths

Three outbreaks exist in health-care settings

Lost dog swims Columbia River multiple times searching for home

The dog was missing from his Castlegar home for three days.

Booze on beach extended through summer in Penticton

Pilot project will stay in place until Oct. 15

Sad ending in case of missing Okanagan senior

Body of Vernon man Wayne Orser found floating in Okanagan Lake Tuesday, July 7

COVID-19: B.C. promotes video-activated services card

Mobile app allows easier video identity verification

ICBC to resume road tests in July with priority for rebookings, health-care workers

Tests have been on hold for four months due to COVID-19

Most Read